中教数据库 > International Journal of Mining Science and Technology > 文章详情

Development of a multiple level underground limestone mine from geology through mine planning

更新时间:2023-05-28

【摘要】The development of a multiple level underground mine is a complex task in which geology, engineering,ground control, and unit operations are integrated into a single mine design. The components are interdependent and must function cohesively to ensure a profitable underground mining operation. To optimize reserve recovery, mine planning should begin from the lowest level and progress up. This limits any misjudgments or oversights of a given level affecting the underlying levels and ensures the ability to maximize recovery from each level. Mine planning should start with the exploration and characterization of the geologic setting. Once the reserve geology and quality is well understood, then mine planning can begin with respect to the following:(1) orientation of mine works with respect to horizontal stress;(2)access to the reserve;(3) determination of opening widths;(4) selection of back, floor horizons and pillar centers;(5) selection of development and secondary mining heights;(6) appropriate inter-burden thicknesses; and(7) examining the stability of the multiple level mine through numerical modeling. The multiple level mine design process and decisions are presented through a case history example. The theme is that there is one opportunity to ‘‘get it right" and many chances to overlook a small aspect within the design that will plague the mine throughout all levels and through the entirety of its operating life.

【关键词】

254 2页 免费

发表评论

登录后发表评论 (已发布 0条)

点亮你的头像 秀出你的观点

0/500
以上留言仅代表用户个人观点,不代表中教立场
相关文献

推荐期刊

Copyright © 2013-2016 ZJHJ Corporation,All Rights Reserved

京ICP备2021021570号-13

京公网安备 11011102000866号